ADDRESS
703A, 199 Jinwan Road,Pudong New Area, 201206, Shanghai, China
CONTACT US
+86-21-68598616
FAX
+86-21-50191951
EMAIL
sinoway@sinoway-sh.com
WHATSAPP
+86-13901310498
WECHAT
sinoway74
| Home | Products | Concrete Equipment | Concrete Placing Boom
Concrete Mixer,Concrete Placing Boom HG28
Specification Sheet
Main specification
Working radius 27.7 m
Slewing range 360°
Working temperature 0~48°
Pressure of system 28Mpa
Climbing system
Climbing speed 0.56 m /min
Working pressure 28Mpa
Boom
1st section 10.5 m
2nd section 9.2 m
3rd section 8.0 m
  • HG28 placing boom is fully hydraulic driven and can be slewed 360 °
  • The climbing frames support climbing through floors and shafts on site with limited space.
  • the balance valve and solenoid directional valve are products of well-known brand.
  • the main electric components are from Omron or Schneide.